BUILDING OF JET FUEL STORAGE IN LIELVARDE AIRFIELD IN LATVIA / 2014 - 2015
The contract for NSPA: Construction of new terminal JET-A1 with 2 vertical storage tanks, one place for unloading tank trucks, two loading SKIDS (islands) for loading tank truck, including additivation system, control system and instrumentation and TAMAS system.
Detail Design Documentation Package for newly built Petrochina terminal in Dongguan. Includes technology for tanktruck loading and control system for the entire tankfarm with planned capacity 400.000 m3. Dongguan is first Chinese terminal designed according to European conventions.
Additivation systems for dispensing into tank trucks at the terminal in INA Rijeka and Solin. The first use of the new blending unit Accuplus - 15pcs.
Four old flowmeters were replaced by SMITH PRIME devices.
Delivery of 6 SKIDs for rail terminal, switchboard for automated control system and instrumentation. Software:TAMAS system. There were needed major adjustments for dispensing into rail tankers. Product is a fuel extracted from shale.
Completely new terminal in Loukov. Building part - new bath, roofing bath, new substation. Technological part - new pumps, piping, low and high pressure valves. Electrical Engineering - new & reconnected drive units . Automation & instrumentation - a new PLC, field instrumentation.
Following the delivery of METROSTAV: full supply for low voltage switchgear for unit PS 262 - construction electrical part. Delivery of the 10-fields switchboard.
Railway terminal: Design, production and recovery of 11 measuring skids, TAMAS system for railway terminal (loading and unloading), mass measurement by Micromotions, Acculoads, integration to the LNHB system.
Delivery of 26 measuring skids with Micromotion for the refinery in Erbil / Kurdistan. Corioli prover with triple mass flow measurement, FloBoss control.
Construction of warehouse storage capacity, supply of instrumentation for a new unit No 237.
Extensive modernization of fuel storage at two locations - Vrbice I and Vrbice II, it affects about 20 objects; realisation: 2010-2012. Construction work and new automated control system for the new technology, a new system of measurement and control + camera security system.
Design, production and recovery of 16 measuring skids and the system TAMAS for AC terminal. Skids based on volumetric measurement (PRIMA4) ACL. Colouring of the product by using devices EVA6. TAMAS system for unloading.
Reconstruction of storage: Installation of two tanks (250 m3), installation of metering skids, build of new loading and unloading islands.
Ostrava Airport - reconstruction of facilities. New wiring - cables, excavations - 22kV and 6kV for the airport area. Public lighting, gas connection. New (building + technology) high voltage substation HTS-2. New high voltage 22 and 6kV switchgear in three substations, new high voltage transformer, reconstruction of low voltage in substations.
Delivery of technology for storage, loading and unloading of products at the Airport of Pardubice, CZ. Delivery of automated control system and instrumentation - switchboard, field instrumentation and TAMAS system. Funded by the EU.
Prague Airport - measurement of density and pressure. Delivery of MicroMotions for measuring of density in the tank of fuel. Delivery of pressure gauges.
Design and fabrication of filtration, measuring and regulating skids based on mass measurements at the beginning and at the end of the pipeline from the company STAROIL. Our first application of crude oil. Development and production of stationary Corioli Prover. The first use of the crude oil analyzer and auto sampler.
The contract for NATO: reconstruction of the airport in Sliač. The construction of new loading from rail tankers including 2 km long pipeline to the reservoirs (3x250m3) and output into tank trucks.
Delivery of metering skids, grounding equipment and TAMAS control system for truck loading terminal for gasoline and shell oil products. At the moment, the project is extended by railway terminal.
Engineering, fabrication, installation supervision and start-up of metering skids and control system. The facility is owned by Neste Oil, a Finnish oil refining and marketing company.
Fabrication of 300 m3/h vapor recovery unit for truck loading terminal Komárom, EPC Jordan Technologies.
Fabrication of 300 m3/h vapor recovery unit for truck loading terminal Bratislava, EPC Jordan Technologies.
Delivery of containerized coloring system, system for measuring of loaded and unloaded products, and TAMAS supervising system.
Delivery of complete truck loading installation with 4 loading islands, 16 metering systems for light fuels, top and bottom loading, additive dosing system for Lukoil and Shell additives, blending of biofuels and coloring of diesel fuels. Installation is completely automated by TAMAS control system.
Delivery and integration of vapour recovery unit with 150 m3/h capacity.
EPC delivery of loading facility for liquid chemicals to river rankers through loading arms DN200. Laoding arms are hydraulically actuated and equipped by ERS (Emergency Rrelease System).
提供了完整的易燃品铁路接卸终端系统(EPC)。.
提供了生物油品的调合和添加剂自动加注系统。
重建CEPRO 3个的油库自动化管理系统。
为德国汉堡油库提供了油品接卸自动化管理系统和发油岛成套设备,以及 EVA5 添加剂自动加注系统。
提供了油库的电子设备部分。
生产H-LBUI, 罐车接卸的一部分。
为奥运会前夕的中石化油库新建和改建提供了油库的自动加注系统 EVA 6 和双泵组橇装。
设计了保加利亚4个战略储备库。
设计,施工,自动加注系统的交付。项目位于浦东国际机场,是世界机场之一。该油库配备了自动加注系统去提高航空油料的电导率。它是机场在油品卸载时用来加注添加剂到油品中。合同的交钥匙交付包括加剂单元和泵组撬装与现有装置的连接。
完成部队油库的重建。
重建Čepro油库接卸终端。
提供了Roudnice油库的自动化控制系统。
提供生物油品技术和设备。
鲁古伊油库EPC总承包项目。
A recuperation unit deployment.
完成CEPRO 100 000m3 油库的交钥匙工程。3(EPC delivery)
完成Roudnice油库自动化控制系统。
设计安装完成付油系统,包括着色和添加的技术。
交付为了用于军事喷气机燃料而生产的添加剂设备EVA5。
交付EVA5添加剂设备
设计安装完成了铁路的接付油自控系统 。
完成PTI公司在LITVA的TAMAS® 和SCADA SCX 的油库一体化自动控制系统。
设计安装完成发轻燃油到铁路的槽车,在此过程中,并均匀的加入添加剂。
设计安装完成了复杂的多瑙河河上油库,包括技术和自控。这些油料通过驳船再用公路和铁路转到各个地方。
完成工程项目的设计、装配和油气回收的自动化控制系统,以及不同的油料产品终端。
完成工程项目的设计、装配、测量、调节控制及接卸的自动化控制。
完成项目的设计和油库的技术,及相应的自控系统。
设计完成工程项目并提供了接付油的技术。
参与乙烯项目的仪表控制单元。
完成油库的项目工程设计、安装和重建。
设计安装完成装配、测量、调节控制及接卸的自动化控制系统。